When we arrived for a meeting with Brad, the carpenters were already there working on the soffit in the kitchen. They also finished a couple of other items, including cutting out the mail slot and raising the height of a pony wall (so that we can accomodate a 36" vanity with a 4" backspash). Also they were able to locate that "missing" switch box that had been hidden behind the plywood near the window seat.





During our meeting with Brad, he re-emphasized the need to finish our tile selection and start ordering the tiles. We told him that we have been meeting with a designer at Tile Source all week and will continue to do so, until it's all done.
For the interior tile and cabinet work, his plan, in sequential order, is:
- Tile the tubs and showers.
- Install the cabinets.
- Make the granite templates and start cutting the slabs.
- Install the floors.