Because of the holiday, we hadn't been to the job site for a few days. We saw Brad at the job site this morning and he had us sign some paperwork for the city to hook up our gas line. Brad really wants to heat the house so the paint will dry better and so the hardwood floor material can acclimate to the house.
Over the long weekend, the plumber installed the water heater.




Brad told us that Dana will be coming back on Monday to put in the kitchen cabinets. Brad also told us he needs us to choose our exterior and interior paint colors soon.
This afternoon we ordered our kitchen and craftroom sinks. We should be receiving them sometime next week.
We finally decided on a french door for the doorway leading to the family room. It will be a pair of stain grade walnut doors with a single, seedy pane on the top 2/3 and a panel on the bottom 1/3.