This morning we went to Home Depot to place a special order for some more lighting fixtures. Unfortunately the fixtures probably won't arrive until late April.
In the afternoon, we met with Lucia at the job site. She brought with her the last vanity top (for bath #2). Her crew had already installed the vanity tops for bath #1 and bath #3 and the fireplace surround.
The dining room pocket doors were installed this morning.
Finally, I went back to Home Depot and picked up some ceiling fans for the upstairs bedrooms and surface mounted fluorescent lights for the laundry room, pantry, mudroom, and craftroom closet.